VisionWear
Manufacturing · Pearl River Delta

The line your product is actually built on.

We do not hand your design to an unknown third party. Boards are placed and reflowed, cases are moulded or machined, finishes are applied and units are aged and tested on production lines we control and audit ourselves — from a first prototype through to a full container.

  • SMT, injection, CNC, PVD finishing and final assembly under one production plan
  • 100% functional test on every unit, plus AQL 2.5 final inspection
  • Tooling, firmware and quality records kept under our own process control
  • Buyer and third-party audits arranged on request

Site documentation, capacity statements and current audit reports are shared during supplier qualification.

Site profile Production base
Site profile of the production base behind VisionWear
Location Shenzhen · Dongguan
Guangdong, China
Production area 12,000 m²
assembly, tooling, finishing
SMT lines 4 high-speed lines
in-line 3D AOI
Assembly cells 6 cells
watch, band and ring builds
Monthly capacity 300,000 pcs
across all three platforms
Quality system ISO 9001 certified
100% functional test · AQL 2.5
Audits Buyer and third-party
audits arranged on request
12,000 m² Production area
4 lines SMT · in-line AOI
300,000 pcs Monthly capacity
ISO 9001 Quality management
The production base

What is actually on site.

Everything a wearable needs happens inside the same plan: electronics, mechanics, finishing, assembly and test. That is what lets a specification change move through a quotation in days rather than weeks — and what makes a defect traceable back to the batch that produced it.

Vertical scope

  • PCB assembly — placement, reflow, in-line AOI and board-level functional test
  • Tooling — injection moulds for cases and straps, CNC for titanium ring bodies and stainless cases
  • Surface finishing — PVD, electroplating, spray and laser marking
  • Display lamination and full-module bonding
  • Final assembly, aging and packing, including retail-ready boxes

Site figures

Production area
12,000 m²
Production staff
260
Engineering staff
35
Shifts
2 shifts, 6 days
Sample shop
On site — CNC and 3D printing
Warehouse
Finished goods and components, separate zones

Site figures are stated as at the last internal audit. Capacity, headcount and certification copies are provided in the supplier qualification pack, under NDA where required.

Production flow

Six stages, and what gets checked at each one.

A defect caught at stage two costs a fraction of the same defect caught after packing. This is why the checks sit inside the flow rather than at the end of it.

  1. STAGE 01

    Incoming material & IQC

    Every lot of cells, displays, sensors and plastics is inspected on receipt against the approved specification. Non-conforming lots are quarantined and reported, not quietly consumed.

  2. STAGE 02

    SMT & board-level test

    Placement and reflow on high-speed lines, in-line 3D AOI on every board, then a board-level functional test before the board is released to assembly.

  3. STAGE 03

    Tooling & sub-assembly

    Moulded or machined parts are checked against the golden sample, finished, then fitted to the board with the display laminated and sealed.

  4. STAGE 04

    Assembly & functional test

    Final assembly, then a full functional test on every single unit — sensing, screen, touch, charging, radio and water-resistance sampling.

  5. STAGE 05

    Aging & reliability

    48-hour burn-in on production samples, plus thermal cycling and drop testing per programme. Failures here send the batch back, not forward.

  6. STAGE 06

    Final QC, packing & shipment

    AQL 2.5 inspection on the finished batch, third-party inspection if you want it, retail packing, carton sealing and shipment on your forwarder or ours.

Any batch that fails a stage is held and reported with an 8D corrective action. It does not ship with a note attached.

Equipment & capability

What the lines can actually do.

If your specification needs a process that is not on this list, say so early — we will tell you whether it is something we run, something we tool up for, or something you should not attempt on this platform.

Production processes and their capability
Process Equipment Capability
SMT placement 4 high-speed lines 0201 chip placement · combined 320,000 CPH
Reflow & AOI 6-zone reflow ovens · in-line 3D AOI Solder joint inspection on 100% of boards
Injection moulding 12 machines, 60–180 T Cases, straps and packaging inserts · in-house colour matching
CNC machining 8 machining centres Titanium ring bodies, stainless steel cases, tooling inserts
Surface finishing 3 PVD and plating lines Black, gold and rose-gold PVD · electroplating · laser marking
Display lamination 3 laminating lines Full lamination with per-lot yield reporting
Assembly 6 assembly cells Watch, band and ring builds, changeover per work order
Tooling & mould making ZNC EDM spark machine · BF-650E CNC centre In-house mould/electrode making and precision metal parts
Milling & surface grinding 2 turret milling machines (3-axis DRO) · multiple precision grinders Jigs, fixtures and tight-tolerance metal components
Injection moulding LK Potenza-II servo hydraulic presses (in-line robots) Cases, straps, eyewear housings and packaging inserts
Battery grading Multi-channel battery capacity separator / cycler Cell capacity sorting and charge-discharge cycling before build
Aging & reliability 48 h aging racks · constant temp/humidity chamber · drop tester Burn-in, thermal/humidity cycling and free-fall drop testing
Environmental & IP test Salt-spray chamber · IPX rain/spray chamber · KX-666 leak tester Corrosion, ingress and water-resistance verification
Mechanical & RF test Insertion/force tester · cable flex tester · vibration table · RF shielded tester · abrasion tester Connector life, flex endurance, transport vibration, RF and surface wear checks
Functional test Test benches · water-resistance tester 100% functional test · IP and ATM sample verification
Packing 2 packing lines Retail box assembly, labelling, carton sealing, palletising

Process capability is confirmed against your specification in the written quotation. Line allocation for a programme is agreed at order confirmation, not at enquiry.

Equipment register

The machines behind those processes.

A representative register of tooling, moulding and reliability equipment on site. Brand and model shown are the installed units; line allocation is confirmed per programme.

Quality system

How a defect is supposed to be caught.

Three inspection gates, one traceability chain, and a written corrective action whenever a batch fails. Buyers who audit us usually start here.

Inspection gates

IQC
Incoming inspection on all component lots
IPQC
In-line checks at SMT, lamination and assembly
OQC
100% functional test · AQL 2.5 final inspection
Third-party
SGS, Bureau Veritas, Intertek or TÜV on request

Traceability & corrective action

Batch records
Component lots tied to work order and date code
Unit records
Serial numbers retained for production batches
Failure handling
8D report issued for any batch-level failure
RMA
Fault units returned to the line for root-cause analysis

Engineering & development

  • Industrial and mechanical design, working from your ID or a joint design pass
  • Electronics, sensor integration and antenna tuning
  • Firmware, algorithms and companion-app builds
  • In-house sample shop — CNC and 3D printing for fast iterations
  • Test and validation plan written per programme, not reused from a template

Tooling ownership

  • Tooling paid for by you is your property, held on site and used only for your orders
  • Tooling is marked with your programme reference and inventoried
  • Maintenance and storage included for the life of the programme
  • Transfer or release of tooling agreed in writing at the start, not at the end
Facility compliance

Certification is a process, not a sticker.

Product certificates are handled per platform and per market. On top of that, the site itself carries management-system and social-compliance certification — which is what a buyer audit actually checks first.

ISO 9001

Quality management

Documented process control across incoming, in-process and outgoing inspection, with corrective action records.

ISO 14001

Environmental management

Covers plating and moulding waste handling — the processes buyers ask about most on a site audit.

ISO 45001

Occupational health & safety

Worker safety management on the production floor, verified as part of the annual surveillance audit.

BSCI / Sedex

Social compliance

Social audit covering working hours, wages, safety and grievance mechanisms — required by most European retail buyers.

Certificates are issued to the legal entity that operates the site. If your procurement process needs the full certificate with the entity name and registration number, we share it during supplier qualification under NDA, together with the current audit report and the site licence. Ask for the qualification pack and it arrives as one document set, not as screenshots.

Audits & visits

Come and look at it yourself.

A site visit answers more questions in two hours than a month of email. We arrange them as a standard part of supplier qualification.

Buyer visits

Production floor, sample shop, test area and warehouse walk-through. Two weeks' notice is enough; we will prepare a programme for your visit.

Third-party audits

SGS, Bureau Veritas, Intertek or TÜV can be commissioned by you at any point, including unannounced inspections on live orders.

Remote walkthrough

If travel is not practical, we run a live video walkthrough of the line producing your programme, with your questions answered as it happens.

An NDA is signed before process documentation, tooling drawings or programme records are shared. Your template or ours.

Factory questions

What buyers ask before they book a visit.

Can we visit the production site?
Yes. Production floor, sample shop, test area and warehouse. Two weeks' notice is usually enough to put a programme together for your visit, and we can line up the engineers who would run your project so you meet them in person.
Which audits do you hold, and will you accept ours?
The site carries ISO 9001, ISO 14001, ISO 45001 and a BSCI or Sedex social audit. You can also commission your own audit — SGS, Bureau Veritas, Intertek or TÜV — including unannounced inspections on live orders. We would rather you verify than take our word for it.
Who owns the tooling we pay for?
You do. Tooling paid for by a customer is that customer's property, held on site, marked with your programme reference and used only for your orders. Maintenance and storage are included for the life of the programme, and transfer or release is agreed in writing at the start rather than negotiated at the end.
Can you run a small pilot production before a full order?
Yes. Trial orders start from 50 pieces at sample pricing, and we can run a pilot batch through the full line — SMT, assembly, aging, test — so the units you evaluate come off the same process as the mass-production run, not out of the sample shop.
What happens if a production batch fails inspection?
The batch is held, not shipped. You get a written 8D corrective action covering the root cause, the containment and the preventive change, plus a re-inspection result before anything leaves the building.
Can you handle the packaging and labelling too?
Yes. Retail box assembly, language-specific labels, barcodes, QR activation inserts and carton marking are all done on site. That is usually cheaper and far more reliable than shipping unpacked units to a third party for finishing.
Do you produce for other brands on the same lines?
Yes, and we will tell you if a programme would be affected. Production is planned per work order with dedicated tooling and dedicated material lots for your programme, so a run of your units is not mixed with another customer's batch.
Book a visit or request the pack

Ask for the supplier qualification pack.

Tell us what you need to see — certificates, audit reports, capacity statement, tooling inventory or a visit date — and we will send the document set or propose a programme.

WhatsApp / WeChat
+86 000 0000 0000
Address
Bao'an District, Shenzhen, Guangdong, China
Business hours
Mon–Sat, 09:00–18:00 (GMT+8)
NDA signed before documentation is shared